Ericsson Cellular GSM

     (2007 - present) Ericsson has tapped Fibercom as one of its BTS Contractor. Fibercom will install/deploy Ericsson's RBS2200 and RBS2100 families of BTS for Sun Cellular's network expansion in the VisMin areas. The job includes installation, testing and commissioning of Ericsson's BTS (RBS2200), Microwave (MiniLink) systems, Power Systems and grounding systems.

ECI SDH Transport System

     (2007 - present) Fibercom is one of ECI's principa; contractor in its SDH deployment. The job is for Fibercom to install/deploy the nationwide SDH networks of Bayantel and Globe, using ECI's SDH ADMs (XDM).

SMART Communications

     (2007 - present) Fibercom was contracted by Smart on a full turnkey basis to supply, design, engineer, install, test and commission a 130-link nationwide network of the RAD AirMux200 Point-to-Point Microwave IP Radio. This deployment is to compliment Smart's nationwide Wireless Broadband Network (SmartBro).


     (2006 - 2007) Fibercom was contracted by Smart on a full turnkey basis to supply, design, engineer, install, test and commission a 241-site nationwide network of the RAD Egate 100, a gateway/concentrator to interconnect Smart's Gigabit Ethernet (traffic) over their TDM (SDH) network, and the RICI4E1, a Network Termination Unit (NTU) to connect Smart's Fast Ethernet LANs over their TDM (multiple bounded E1s). This deployment is to compliment Smart's nationwide Wireless Broadband Network (SmartBro).

Bayan Telecommunications

     (2005 - 2006) Fibercom was contracted by BayanTel on a full turnkey basis to supply, design, engineer, install, test and commission a 19-site nationwide network of the RAD DXC30 and DXC8R. This is to compliment BayanTel's nationwide TDM Data Network to serve its growing Data subscriber base.

ALCATEL

     (2005) On the second quarter of 2005, Fibercom Telecom Philippines, Inc. was tapped by Alcatel Philippines Incorporated for the installation, commissioning and acceptance of its IP DSLAM equipments for the Innove DSL Phase 3A Project in Eastern Visayas, complimenting its nationwide IP Network to apress the growing subscriber base and to accommodate the migration of traffic towards IP-centric.

ERICSSON / DIGITEL

     (2003) Ericsson commissioned Fibercom for the termination of its major Outside Plant deployment with Digitel Telecom. The project was for Digitel's Expansion and Rehabilitation of its Public Switched Network (PSTT) in Luzon. Led by Fibercom Project Managers, Supervisors and Engineers, the task was to rehabilitate the whole F.O. Network in four (4) provinces, namely Bulacan, Rizal, Cavite and Laguna.

Korea Satellite

     (2002) During the second quarter, Fibercom installed and commissioned in ONSE Teleport a complete Satellite InterSky System in Extended C-Band for the Korean and Asean Market.

Textron Corporation

     (2002) Fibercom successfully supplied and deployed Shiron VSAT system in teh Philippines in the first quarter through Textron Corporation. Fibercom supplied 1 hub and 20 remote gateways. With this, Fibercom had established SHIRON as a complete VSAT solution for the country especially with the current demand for broadband communications.

Installation for Kuwait

     (2002) Fibercom engineer installed a Remote Gateway connected to a hub in the Miple East linked to LMA Satellite (Russian).

Singapore Technologies

     (2002) Fibercom installed the hub and sites equipment for the Bid awarded by Singapore Technologies to Shiron Satellite, in the first quarter.

Iglesia ni Cristo

     Fibercom successfully designed, installed and commissioned the Shiron Inter-Sky system for INC's network.

Marubeni / PILTEL

     (1998) For PILTELs E.O. 109 project, Marubeni Corp. contracted Fibercom to supply , design, engineer, install and commission a complete ANDO Fiber Optic Cable Monitoring System , for the whole 680-km 2-ring Fiber Optic cellular network installed in the Mindanao region. Based on OTDR technology , the Ando RFTS combined data management and remore control functions. It can quickly and accurately detect errors or faults like cuts, burns or obstructions in the F.O. cables and confirm that the recovery has been completed. The system was installed during 1999 and successfully commissioned by a team of Fibercom engineers, supported by ANDO engineers during the said year. The system closely monitors Piltel's Optical Fiber Networks in Mindanao, thereby reducing maintenace costs, and contributes to accident prevention and proper maintenance.