Work & Our Trusted Client
Our previous and current clients have trusted our services since 2008, a testament to our commitment to quality and excellence in telecommunications.
The employees of Bamacom possess technical expertise and track records gained from projects associated with our well-known and trusted clients.














RADIUS (2016): This project involved the supply, design, installation, and commissioning of a Gigabit Passive Optical Network (GPON) using the Calix Optical Line Terminal (OLT) and Optical Network Unit (ONT). The goal was to maximize RADIUS’s fiber optic platform across Mega Manila, enhancing connectivity and network performance.
RADIUS (2015-2017): During this period, our team implemented the supply, installation, and commissioning of a Managed Media Converter Project. This initiative deployed a total of 1,240 RAD Miniature Programmable Network Interface Devices (MiNID), ensuring a highly reliable, secure, and cost-effective communication superhighway for their valued clients.
MERALCO (2011-2017): This initiative encompassed the supply, design, installation, commissioning, and maintenance of the Multi-Service Access Platform (MSAP) across three phases. A total of 107 RAD Megaplex-4100 units were deployed, connecting various Meralco substations, repeaters, and business centers. The network facilitated seamless data, voice, fiber, and teleprotection services, ensuring reliable and efficient communication.
Meralco BWA Project (2010-2015): This full turnkey Broadband Wireless Access (BWA) system project covered Metro Manila and Luzon, implementing 31 wireless links to enhance connectivity and network coverage.
ECI-Smart FITL Phase 5b Project (2009-2010): This project spanned over 145 sites across Quezon City, Laguna, and Cavite. Bamacom’s scope of work included site survey, installation, commissioning, testing, acceptance, and documentation, ensuring seamless implementation.
ECI-Smart FITL Phase 5b Project (2010): As an expansion of the initial project, this phase extended coverage to more than 40 additional sites in Laguna and Cavite. Subcontracted by ECI, Bamacom continued its role in the project, providing site survey, installation, commissioning, testing, acceptance, and documentation.
ECI-Smart Palawan BB Project (2009-2010): In particular, this is composed of 20 sites. This project is a backbone expansion comprises Smart sites in the islands of Palawan, Mindoro and stretch until Iloilo province. Specifically, the scope of Bamacom works covers installation, card insertion, testing, acceptance and documentation.
ECI-Bayantel OPAC Upgrade (2008-2009): Notably, ECI subcontracted this project to Bamacom. It is composed of 106 Sites (with ECI equipments) installed in OPAC and additional XDM100 for Headend. In conclusion, the Fibercom participation to this project covers the site survey, installation, powertapping, commissioning, testing, acceptance and documentation.
In summary, through these projects, we have continuously demonstrated our expertise in telecom solutions while strengthening our partnerships with trusted clients.
